Thursday, June 4, 2009

Building the System -- Day 9

The electricians are installing the two inverters, an extra fuse box and a safety cutoff. Instead of running cables up down and all around the wall, R. and D. took the time to cut the sheetrock and hide the cables inside the wall.

They even used a level to make sure these were mounted just right.

Closer look.


2 comments:

Sandy said...

I can't wait to see the spreadsheet showing energy produced and energy used. If it were me, I would be checking the meter all the time to see what was happening.

Dave Conifer said...

I think we've worn a path. We're checking them constantly...